Almost all marble, granite blocks & similar stone material are extracted from quarries, but often many blocks shows heavy structural defects therefore can not be worked or used; this entails a big waste material that could be potentially usable.
Working defective stone blocks to transform it into slabs always represents important safety problems. This operation can be dangerous because by managing defective block it can crumble damaging men and machinery all around.
The increasing environment sensitivity from excavation companies, institutes and people demands a more and more efficient system in using not-renewable natural goods such as stone products.
Therefore, it’s getting more and more important to increase the extraction cycle general efficiency making useful also the blocks whose usage isn’t economically valid according to the current techniques.
PROMETEC was able to solve this problem by extending its experience about hardening operations for slabs and applying it to reinforce the stone blocks too. Reinforcing mode changes according to stone material, kind of defect and customer’s request.
Offered systems:
HRVP and HRVP EXTENDED
production for solving any problem of defective stone blocks. Know – how transfer and personal training are included in the offer guaranteeing constant and firm results.
Our system has the following peculiar features unlike anything else traditional process achieving the same aim:
- Possibility to work block with any dimension and form
- Planned resin quantity and reinforcing material
By utilizing vacuum system and an innovative retaining device the consumption of resin is really lower if it is compared to the traditional system:
- Certain e constant results for all stone material
- Device proportioned to the required production and the available places
- No loss of slabs during cutting
Rosso Albania
1.Structurally sound block
2.Slabs sawn from a finished and structurally sound block
3.Close up of resin on slab
Giallo Siena
1.Structurally sound block
2.Slabs sawn from a finished and structurally sound bloc
3.Close up of resin on slab
-
Resins
We use bi-component epoxy resins studied properly for the HRVP process. The special formulations produced change according to the material of the block to be worked and to its fractures. The plant sale contract includes the resins supply for a period to be established during the negotiations.
-
Complementary Tools
Besides studying the usage, Prometec has optimized shape, dimension and quality of all complementary tools necessary for the working cycle good execution.
The plant sale includes them in the supply. -
Consumable materials
The first supply includes all the expendable materials, such as:
- Materials for resin confinment
- Aerating material
- Reinforcing layers
- Draining material
- Fittings for the different connections
- Various pipes
-
MONTAGGIO, START- UP E COMMISSIONING DELL’ IMPIANTO
Prometec, oltre al montaggio ed all’avviamento dell’impianto, si propone con il proprio personale per un adeguato periodo di training, tale da garantire il risultato finale sui materiali lavorati e lavorabili dalla società acquirente.
Technical data
| Consumption | Small block (2,9 m3) | Medium block (5,6 m3) | Big block (12 m3) |
|---|---|---|---|
| Gas | 10 m3/h | 12 m3/h | 15 m3/h |
| Block setting time (with 2 worker) | 40 min | 60 min | 70 min |
| Resin injection time | 15 min | 25 min | 35 min |
| Quantity of resin | 34,32 kg | 53,62 kg | 88 kg |
| Fiberglass | 13,5 mq | 21,06 mq | 34,56 mq |
| Net | 13,5 mq | 21,06 mq | 34,56 mq |
| Nylon | 13,5 mq | 21,06 mq | 34,56 mq |