Production capacity: from 7 to 20 slabs hour For this kind of line the single storehouse executes two different purposes: Slabs drying and Slabs catalysis.
This storehouse, or silo, is separated by two independent rooms: the first one for the slab drying the second for resin catalysis process, each one equipped with his own heating devices avoiding any contamination between the two atmospheres. Slab is inserted into shelve by means of an automatic lift, here the slab lays until the thermal treatment ends (drying or catalysing). Loading and unloading places can be located either in the same end of the line or in its opposites extremities. In the second case two separated machines are needed. Such a plant line is really compact allowing a medium-low production that is between 7 and 20 slabs/h.